Norske Skog, Turning Water into Money

Norske Skog Paper Mill
The modified filter house with a built-in PreCooler

The Norske Skog GmbH in Bruck a.d. Mur in Austria runs a paper mill. They generate part of their power and heat demand through a Frame 6 gas turbine with an ISO output of 39 MW. The machine is operated on base load throughout the year.

Each summer the company runs into a power shortage and needs to purchase electricity from the net. This is caused by the decreased output of the gasturbine at the higher outdoor temperatures.

Design:
After a study it was decided to install a PreCooler from Munters. Because of the existing design of the filterhouse, part of it had to be extended to integrate the PreCooler. The work included the relocation of the anti-icing system.

Installation:
Munters took on a turn key installation job and completed the work in 12 days during an inspection stop of the gas turbine. The work included the modification of the existing filter house, the supply and return piping, structural steel work and the integration of the Munters PreCooler.

Result:
Based on hourly weather data and in-depth knowledge about the turbines reaction to different outdoor temperatures Munters made an analysis in their Turbocool program. It shows month by month the expected power recovered. In this specific installation it meant a payback period of only a couple of months on the whole PreCooler installation. Turbocool also shows that the Munters PreCooler will add about 20 cubic meters of water to the airflow per day, during the warmest period of the year.


• More than 3MW increased output at peak temperatures, increasing the efficiency by 1.9% (relative)

• No need to purchase external electricity

• Inlet air temperature of the gas turbine is kept well below 22 C°

• The cooler was installed turnkey within 2 months and in time for the summer season

• A pay-back period of less than one summer


The Turbocool calculation shows an annual recovery of
over 4,000 MWHR by the use of a Munters PreCooler

 
For details about our evaporative cooling methods check the Technologies section!

© 2005 Munters Euroform GmbH
www.precooler.com

 

Case Studies
 


Case Studies

Phillipines
6x V94.2A

India
2x GT8C

Italy
9x Fogging Systems

Salt Lake City, USA
3x GE LM 6000 sprint

Austria
Frame 6

Greece
2x ABB GT 8 C

Burgin, USA
2x ABB GT 24

Malaysia
3x ABB GT 13E2